Model
Criteria, constraints, and prototype
Run 3 prototype tests. Record load or demand, resource constraint, performance margin, and the first failure mode.
- Criteria
- meets the intended function; retains a measurable performance margin
- Constraints
- limited resources and time; safe and inclusive operating boundary
- Failure measure
- Performance margin
- Tradeoff
- Defend why the revision improves the priority criterion without concealing a cost, risk, or reduced margin.
Evidence
Performance and failure margin
Commit a falsifiable model and run the repeated trials to generate the dataset.